fixtures without use of ladders or lifts. This is helpful for the theatrical team to change, move, clean, adjust, etc. The rigging system included (4) Thern clew winches that allow a user to raise or lower the on stage pipe battens containing lights. The school’s theatrical team, as well as administrators were very impressed. Though there were a few delays in construction (when is there not?), the contractors were able to turn over a newly renovated, fully functional theater to the school on time. This project required careful coordination with many allied trades over many months to ensure that construction was done efficiently and without conflict. The total cost of the theatrical portion of this project was close to $750,000. Starlite was hired by the electrical contractor (DEC Electric) to provide all the equipment and labor to complete the installation of each of these systems. This included the replacement, and upgrade of all theatrical systems, including audio, video, lighting, and rigging. This project was a complete renovation of the auditorium at Winslow Township High School.
0 Comments
Leave a Reply. |